Welcome to S.C. Power Company Pvt. Ltd.
S.C. Power Company Pvt. Ltd. was incorporated on 2063/05/20 B.S. (September 5, 2006) under the laws of Nepal (Company Registration No. 41031/063/064, PAN: 302484080). Established to pioneer large-scale renewable energy infrastructure, the company is developing the 440 MW Tila-1 Peaking Run-of-River Hydropower Project in Kalikot.
Headquartered in Lalitpur, Nepal, our company brings together seasoned energy developers, senior public policy leaders, and engineering specialists dedicated to accelerating the transition toward a self-reliant and decarbonized national power system.
Tila-1 Hydropower Project (440 MW)
The Tila-1 Hydropower Project is a Peaking Run-of-River (PRoR) development situated along the Tila River in Kalikot District, Karnali Province. The project area is directly accessible via the Karnali Highway, providing dependable all-weather heavy logistical transport for electromechanical and civil plant equipment.
The civil scheme comprises a 69-meter high gated concrete gravity dam with seven spillway bays, underground desilting chambers engineered to extract quartz sediments, a 13.77 km headrace tunnel excavated via six strategic adits, and an underground powerhouse cavern (120.5 m × 18.5 m) accommodating four vertical-axis Francis turbines.
Designed for optimal peaking flexibility, Tila-1 operates with 6 hours of daily peak capacity, supplying essential stability and reserve power to the Nepal Electricity Authority (NEA) grid network.
Explore Technical Salient FeaturesProject Pillars & Sustainable Engineering
Tila-1 combines sound hydrological fundamentals, modern underground civil design, and international Environmental, Social & Governance (ESG) standards.
Peaking Run-of-River Scheme
Features a 6-hour daily peak generation cycle to meet national peak electricity demand during critical morning and evening load hours, ensuring maximum grid stability.
400 kV Karnali Corridor Evacuation
Direct power evacuation into the Rastriya Prasaran Grid Company Ltd (RPGCL) 400 kV Phukot Hub Substation, establishing seamless transmission across Nepal and cross-border corridors.
Zero Resettlement & E-Flow
Zero household relocation or physical displacement required. Maintains a guaranteed downstream environmental flow of 2.03 m³/s, coupled with dedicated upstream fishway systems.
97% Local Public Consensus
Overwhelming local community support demonstrated during Kalikot public hearings, complemented by priority local employment, pre-construction skill enhancement, and community development.
Board of Directors & Executive Guidance
S.C. Power Company Pvt. Ltd. is guided by a diverse board of experienced energy industrialists, former senior diplomats, and infrastructure specialists.
Susan Karmacharya
Corporate leader with over 30 years of executive experience across hydropower, finance, and infrastructure. Vice-President of the Independent Power Producers' Association Nepal (IPPAN), Executive Member of Nepal Chamber of Commerce (NCC), and Chairperson/Director across major hydropower projects in Nepal.
View Executive Profile →
Shankar Das Bairagi
Distinguished diplomat and senior public sector leader with more than 35 years in governance, international negotiations, and strategic administration. Former Chief Secretary of the Government of Nepal, Foreign Secretary, Ambassador, and National Security Advisor.
View Executive Profile →
Narendra Balav Pant
Hydropower developer and business leader with 15 years in energy and 18 years in capital markets. Vice-President of IPPAN and Chairman of Dev Group, stewarding an operational and under-construction portfolio exceeding 334 MW across Nepal.
View Executive Profile →Field Explorations & Project Environment
Authentic images from geological drilling, subsurface adit explorations, river hydrology, and site infrastructure in Kalikot District.